Arsenal.ge Arsenal.ge
Project Choose Apartment News Contact
grea
  • Facebook
  • Instagram
  • Youtube
  • Linkedin
ka ru
The construction work of A and B blocks in Arsenal Residence is underway.
The construction work of A and B blocks in Arsenal Residence is underway.

In block A, reinforcement work is underway for the vertical construction of the top floor, with forms being prepared and concrete pouring in progress; Block arrangement works are underway including on the 3rd floor; 90% of frame-monolithic construction works have been completed; The roofing slab on the 2nd level of parking at B block is in the process;

24 / 04 / 2024
The construction work of A and B blocks in Arsenal Residence is underway
The construction work of A and B blocks in Arsenal Residence is underway

85% of the monolithic frame in block A has been completed. Foundation pouring in Block B has been completed and roofing work on the first level of the parking lot is underway.

29 / 03 / 2024
PROJECT CONSTRUCTION IS IN AN ACTIVE PHASE
PROJECT CONSTRUCTION IS IN AN ACTIVE PHASE

Project construction is in an active phase. Currently, the arrangement of the slab foundation of the first residential floor is in progress.

10 / 11 / 2023
Project construction works have actively started
Project construction works have actively started

Project construction is in active stage. Currently the arrangement of the slab foundation of the first residential floor is in progress

31 / 05 / 2023
Pre-sale of apartments has started
Pre-sale of apartments has started

You can choose an apartment from 57 m2 in a premium green frame condition.

01 / 02 / 2023
Arsenal.ge - Homepage

Search apartment

Apartments for sale
Arsenal
  • Facebook
  • Instagram
  • Youtube
  • Linkedin
  • Menu
  • Project
  • Choose Apartment
  • News
  • Contact
  • Project
  • About Project
  • Choose Apartment
  • Location
  • Gallery
  • APPARTMENT SALES CONDITIONS
  • mail
    info@ar.ge
  • phone
    (032) 2 50 22 33 / (995) 500 50 22 11 / (995) 500 50 22 33
  • Giorgi Gedevanishvili Str. 21 | Project location
    Ketevan Dedofali Ave. 18 | Sales office
©2025 | Arsenal Residence LTD | All Rights Reserved